Satlyt sells a route for deploying software on compatible spacecraft, with 2027 mission packages currently open for booking. Its proposition is to process data near the satellite sensor or onboard system and return useful outputs to Earth. The relevant buying decision concerns a qualified mission, workload and acceptance plan. This review uses evidence checked on 26 November 2026. Source: current orbit packages.

What Matters

  • Start with the mission. The hardware, data access, execution allowance and return path must fit the proposed experiment.
  • Budget the full package. The entry deposit is part of a larger milestone-based commitment.
  • Separate demonstration from capacity. A successful flight experiment establishes a narrower fact than a generally available orbital cloud.
  • Define useful output. Returned bytes are valuable only if they meet a scientific or operational acceptance criterion.
  • Keep authority explicit. Workload approval, spacecraft operations and rollback belong in the integration agreement.

The Signal

Satlyt is most compelling when a team has a concrete reason to compute in orbit: limited downlink capacity, intermittent contact, a need to assess data before transmission, or a research question about onboard operation. The public offering is specific enough to support a procurement discussion, and published flight evidence is more useful than a concept illustration alone.

The buying question is whether an agreed mission can return the evidence your project needs at an acceptable total cost. A general ambition to put AI in space is too broad to answer it. Our verdict therefore depends on workload fit, measured acceptance criteria and the service agreement, with no claim that DN has deployed or benchmarked a workload.

Satlyt profile

ItemPublic evidence at review date
Official sitesatlyt.ai
ServiceOrbital application runtime, mission integration and onboard workload execution
Primary usersSpacecraft operators, application developers, AI teams and research programmes with mission-specific requirements
Commercial status2027 bookings advertised; execution is subject to compatibility and confirmed mission scope
Entry packageOrbital Starter: $5,000 total, including a $500 deposit
EvidencePublished flight reports, a Google DeepMind case study and a partner mission agreement
DN test boundaryPublic-source review; no booking, payment, submitted application or orbital execution

Product and integration descriptions are available on the official integration page. The package terms explain the confirmation and payment boundaries.

What Satlyt provides

The integration documentation describes a runtime and orchestration layer for approved workloads. It lists 64-bit Linux on ARM64 or x86_64, prefers OCI/Docker-compatible packaging and allows approved native packages for constrained systems. Data can arrive through mission-approved files, local interfaces or adapters. Hardware and accelerator access remain workload- and mission-dependent. Source: integration requirements.

This suggests a useful division of work. The application team defines inputs, dependencies, expected outputs and failure behaviour. The integration process maps those requirements to a particular host and mission. A package that runs on a developer’s laptop still needs resource, data-interface and operational validation for its intended spacecraft environment.

A practical application specification should state the maximum input size, memory ceiling, expected runtime, tolerated interruption and recovery behaviour. It should also say what happens to partial results and which evidence proves successful completion. Those requirements make a pilot reviewable: both parties can distinguish an application problem from a resource constraint or a missed data opportunity.

The network page labels portions of the multi-satellite design as hardware-in-the-loop, simulation or a next flight phase, alongside flight-demonstrated elements. We therefore treat the wider network as a development programme with different evidence levels across components. The existence of a mission booking does not prove that every depicted inter-satellite capability is already available to each customer. Source: network architecture and phase labels.

What has been demonstrated?

Satlyt’s November report says research libraries executed on 14 October aboard a Momentus spacecraft using a DPhi Space-hosted platform, with results returned. The experiment modelled several hosts while running on one spacecraft. Satlyt’s provisional TRL 6 assessment is explicitly subject to completing supporting validation documentation; it should not be presented as an independently certified readiness level. Source: flight report.

The distinction between a modelled host and a physical spacecraft matters. A scheduling algorithm can be evaluated in orbit using a scenario representing several nodes without proving a deployed multi-spacecraft network. That does not diminish the experiment’s purpose. It defines what a buyer should ask to see next when the intended application depends on actual distribution, crosslinks or failover between spacecraft.

Google DeepMind’s case study describes an onboard quantized Gemma 3 model analysing logs and faults, and separately describes ground evaluation of Gemma 4 on Jetson hardware. It presents example diagnostics and constrained-hardware measurements. These are specific workload observations, not a general throughput, power or accuracy guarantee for a customer’s mission. Source: Google DeepMind case study.

Rogue Space Systems also published an agreement for Satlyt demonstrations on its OTP platforms. An agreement is evidence of a planned partner relationship; the announcement alone does not establish the eventual result of every named mission. Source: Rogue mission announcement. Taken together, the sources support a serious technical diligence conversation while leaving customer-specific acceptance work to be done.

Packages and payment commitments

Published packageTotalDepositAfter integration and allocationBefore execution
Orbital Starter$5,000$500$2,000$2,500
Orbital Pilot$10,000$1,000$4,000$5,000
Managed Mission$25,000$2,500$10,000$12,500

The current payment terms allocate 10%, 40% and 50% to the three milestones. They provide for automatic milestone charges after agreement, with at least 72 hours’ advance email notice. The deposit does not guarantee a launch date, host allocation or execution. Cancellation and refunds depend on the service agreement; extra work is separately agreed. Source: versioned package and payment terms.

Starter describes one application on a compatible host and a defined execution allowance. Pilot adds a larger workload allowance and scheduled support, with GPU access only when supported and confirmed. Managed Mission describes bespoke integration and agreed reporting. The amounts and inclusions are the published starting comparison; the actual workload scope still needs confirmation. Source: package descriptions.

The correct budget includes the internal work needed to prepare an application, analyse its returned data and decide what to change after the first run. A low booking deposit can make the first step accessible without reducing those later requirements. Procurement should also identify whether a new workload version counts as included iteration or extra work.

DN Orbital Pilot Milestone Budget

The companion worksheet models the disclosed milestone schedule and your own preparation costs. It does not quote a launch date, predict a flight success rate or turn an unconfirmed execution allowance into guaranteed capacity. The unit-cost field is only meaningful when the user supplies a defined number of accepted outputs.

For a synthetic Starter example, enter the $5,000 package, 12 internal integration hours at $100 per hour and $300 of additional budget. The total declared project budget is $6,500. Package payments are $500, $2,000 and $2,500. If the first milestone has been paid, $4,500 of package balance remains; internal expenses are shown separately so they are not mistaken for a charge by Satlyt.

If the experiment defines ten accepted output units, the scenario budget is $650 per accepted unit. “Unit” might mean a validated image batch, an agreed diagnostic run or another measurable deliverable. It cannot mean a generic GPU-hour unless that is the contract’s actual unit. If only five units are accepted, the same budget becomes $1,300 per accepted unit. These are arithmetic sensitivities, not predictions of mission reliability.

Question the worksheet answersQuestion it cannot answer
How much package balance remains at a chosen milestone?When the next mission milestone will be reached
What does the declared internal work add to the budget?Whether additional engineering will be required
What is cost per explicitly defined accepted output?How many useful outputs the mission will deliver
How does a smaller accepted-output count change the unit cost?Whether the experiment’s scientific objective will be met

The tool leaves unit cost blank when the acceptance unit or count is unknown. It also distinguishes a budget allowance from an actual billed expense. That separation prevents a precise-looking number from hiding an unresolved commercial or technical assumption.

DN Orbital Pilot Milestone Budget

Change the assumptions to explore an illustrative scenario. The tool does not obtain a live quote, access an account or submit a transaction. Calculations run in your browser. Export downloads your inputs and results as a JSON file; the source evidence is a separate download. This page also uses the site’s standard analytics.

Illustrative defaults shown. Controls initialise when the page is ready. The static worked example remains readable.

10% package deposit (USD)500.00
40% integration/allocation payment (USD)2,000.00
50% pre-execution payment (USD)2,500.00
Package amount paid at selected stage (USD)500.00
Package amount remaining (USD)4,500.00
Entered internal integration cost (USD)1,200.00
Total declared project budget (USD)6,500.00
Budget per defined accepted output (USD)650.00

Uses the published 10% / 40% / 50% schedule reviewed 26 November 2026; confirm your agreement. Internal and other budgets are not Satlyt charges. Per-output cost is not applicable if the acceptance unit/count is unknown. No launch date, available capacity, accepted-output count or mission success is predicted.

Design the pilot around acceptance

A worthwhile orbital pilot should have a narrow question that ground work cannot adequately answer. For an onboard classifier, the objective might concern the quality and size of returned detections under the mission’s real data and resource limits. For diagnostic software, it might concern whether the result preserves enough information for a ground engineer to identify the injected fault. These are illustrative project designs, not claims that either is included in a particular package.

Before committing, specify an acceptance record: application version, input identifier, execution timestamp, resource observations, output checksum and a defined quality measure. Choose an error-handling rule before the results arrive. Otherwise, an incomplete output can be counted as success by one party and failure by the other.

Compare that record with a ground baseline using the same application and representative data. A smaller returned payload can be useful, but only alongside a measure of information retained. A fast answer that misses the relevant event may save bandwidth while failing the mission objective. Performance should therefore be assessed as a combination of output usefulness, resource consumption and operational reproducibility.

Satlyt’s Shuri Lab describes telemetry summarisation, task management and communications interpretation as application areas. Those examples help generate a shortlist of possible workloads; they do not replace a customer’s own validation plan. Source: Shuri Lab.

Control, security and mission data

The integration page assigns compute availability, data permissions, network access, deployment approval, mission operations and rollback to the spacecraft operator. That is an essential boundary for assessing an application service: access to a workload environment does not imply authority over the spacecraft. Source: operator responsibilities.

Our recommended diligence is to map every requested permission to a workload requirement. Does the application need read-only imagery, write access to a results volume, network access or a persistent credential? Which component can activate or stop it? Who can review logs? The answers should be visible in the deployment profile and service agreement, rather than inferred from a general statement about encrypted communications.

The website privacy policy covers contact, application and booking details, and says Stripe handles card payments. It also describes website analytics and cross-border service-provider processing. This is useful for understanding the booking interface, but it does not provide a complete customer mission-data contract. Source: privacy policy.

A prospective customer should establish ownership of source code, model weights, mission inputs and outputs; permitted support access; storage locations; retention and deletion; and how incident information is shared. We did not verify a complete public security-audit package, a customer-specific data-processing agreement or a general uptime commitment. Those omissions limit this review’s security verdict without proving that such arrangements are unavailable.

Availability and project dependencies

We classify the service as restricted by mission qualification: the booking path is public, but execution depends on compatibility, allocation and confirmed scope. This is a more useful description than treating the homepage as evidence of immediately available capacity. Timing should be established for the specific host and project.

For an organisation, the remaining procurement questions include eligible workload types, relevant country or export conditions, host access rights, insurance or liability allocation, and what happens if a launch or operating window changes. Our reviewed sources do not support a universal eligibility claim. Those questions should be answered within the applicable agreements, especially when a project has a fixed research deadline.

A small pilot can still have dependencies outside the application team’s control. The project plan should state which delays are recoverable, whether a different host changes the technical acceptance criteria, and who signs off a substitution. This is practical scheduling diligence, not a prediction that a particular mission will be delayed.

Alternatives and tradeoffs

RequirementAlternative to compare
Validate an algorithm or packaging changeGround hardware, simulation or hardware-in-the-loop work with representative constraints
Process already downlinked dataGround compute sized for the data and response-time requirement
Test a workload on real orbital hardwareA scoped Satlyt package or a directly contracted hosted-payload arrangement
Control a dedicated hardware experimentA broader mission integration with explicit hardware, operations and schedule responsibilities

Satlyt’s potential advantage is reducing the work between an application team and a suitable orbital host. Its limitations follow from the same interface: a buyer inherits mission resource, data and schedule constraints. A narrower ground experiment may answer an early software question more efficiently. Real orbital execution becomes valuable when the remaining question actually depends on the orbital environment or mission workflow.

Verdict

Satlyt is a credible candidate for a carefully scoped orbital software pilot, with mission acceptance as the deciding factor. The current package schedule and published flight evidence justify technical and commercial evaluation. They do not establish unlimited compute, a guaranteed launch or universal workload readiness. Define the experiment, confirm the host and data, budget the full commitment and require an acceptance record that makes the result usable.

Methodology and disclosure

DN reviewed official package and payment pages, integration requirements, network phase labels, privacy information, Satlyt flight disclosures, a Google DeepMind case study and a Rogue Space Systems announcement on 26 November 2026. No payment, mission booking, software upload or hardware test was performed. Provider and partner reports remain attributed. The worksheet is a synthetic project-budget exercise. No referral URL was supplied for Satlyt.

Frequently asked questions

Can I run any application on Satlyt immediately?

The published process requires compatibility review and confirmed mission scope. An application must fit the host, resource limits, available data and operator-approved deployment process.

Is the $500 Starter deposit the total price?

No. The current Starter package is $5,000 in total. The $500 deposit is included in that total and begins onboarding; later payments follow the published milestones.

Does a booking guarantee a launch date?

The current payment terms expressly make host allocation, timing and execution subject to confirmation. A deposit alone is not a guaranteed flight date or execution commitment.

Has Satlyt run software in orbit?

Satlyt has published specific execution reports, and Google DeepMind describes an onboard Gemma deployment. Each demonstration has its own scope; it does not establish that every future workload or network feature is already qualified.

Does Satlyt control my spacecraft?

The integration documentation places deployment approval, data permissions, mission operations and rollback under the spacecraft operator’s control. A specific agreement should define the exact permissions granted to each component.

What should the first pilot measure?

Choose a narrow mission-relevant question, define accepted outputs and compare them with a ground baseline. Include information quality, resource use and reproducibility rather than counting returned bytes alone.

Sources and evidence register

The register records the sources and scope used for this dated review. Platform statements are attributed evidence, not independent certification. Illustrative calculations are labelled separately from observations.

1. Satlyt official website

Open primary source · Satlyt · Reviewed 2026-11-26

Service identity and current brand

2. Orbit packages

Open primary source · Satlyt · Reviewed 2026-11-26

2027 bookings, prices and package inclusions

3. Package and payment terms, version 2026-11-03

Open primary source · Satlyt · Reviewed 2026-11-26

Milestones, notice, conditional allocation and refunds

4. Integrate with Satlyt

Open primary source · Satlyt · Reviewed 2026-11-26

Packaging, compatibility and operator responsibilities

5. Satlyt Network

Open primary source · Satlyt · Reviewed 2026-11-26

Architecture phase labels

6. Satlyt demonstrates NASA-funded computing software in orbit

Open primary source · Satlyt · Reviewed 2026-11-26

Specific execution and provisional readiness assessment

7. How Satlyt is building local AI for space with Gemma

Open primary source · Google DeepMind · Reviewed 2026-11-26

Onboard Gemma3 and separate ground evaluation

8. Rogue Signs Satlyt to OTP-2 and 2B Missions

Open primary source · Rogue Space Systems · Reviewed 2026-11-26

Mission agreement

9. Shuri Lab

Open primary source · Satlyt · Reviewed 2026-11-26

Example onboard application areas

10. Privacy policy

Open primary source · Satlyt · Reviewed 2026-11-26

Booking data and payment processing

Download the dated evidence register (JSON)

Research and collaboration

For product demonstrations, research enquiries or clearly disclosed commercial collaborations, contact Decentralised News. Commercial arrangements do not purchase a favourable review or change the evidence standard.

Get the most talked about stories directly in your inbox

Join the Decentralised News briefing for independent crypto, DeFi and AI analysis. No spam, unsubscribe anytime.