  "schema_version": "dn.research.evidence.v1",
  "research_cutoff": "2026-11-25",
  "edition": 2027,
  "observed_outcomes": "No DN-run pilots, customer meter observations, paid settlements, completed cost-shifting study or realised commercial returns claimed.",
  "title": "Can an AI Data Centre Pause for the Grid? Demand-Response Economics in 2027",
  "canonical_url": "https://decentralised.news/ai-data-centre-demand-response-economics-2027",
  "jurisdiction": "Indiana Michigan Power Indiana Rider D.R.S.1; PJM operator-level Capacity Performance rules",
  "sources": [
    {
      "id": "IURC-50926",
      "title": "Utility articles approved 2 September 2026, I&M filing 50926",
      "publisher": "Indiana Utility Regulatory Commission",
      "url": "https://www.in.gov/iurc/files/ord_UA_090226.pdf",
      "published_at": "2026-09-02",
      "retrieved_at": "2026-11-25",
      "supports": "$9.56/kW-month curtailment payment applicable through 31 May 2027; 29 July filing and 28 August memorandum.",
      "short_excerpt": "",
      "retrieval_note": "Primary document read or primary page retrieved; no secondary source relied upon."
    },
    {
      "id": "PJM-M18-63",
      "title": "PJM Manual 18: PJM Capacity Market, revision 63",
      "publisher": "PJM Interconnection",
      "url": "https://www.pjm.com/-/media/DotCom/documents/manuals/m18.ashx",
      "published_at": null,
      "retrieved_at": "2026-11-25",
      "supports": "Sections 4.3.1 and 8.6: response notice, product availability, unlimited interruptions, measurement and comparison-load conditions. Current full manual retrieved.",
      "short_excerpt": "",
      "retrieval_note": "Primary document read or primary page retrieved; no secondary source relied upon.",
      "effective_at": "2026-09-24"
    },
    {
      "id": "IM-DRS1-2627",
      "title": "2026–2027 Rider D.R.S.1 contract",
      "publisher": "Indiana Michigan Power",
      "url": "https://electricideas.com/wp-content/uploads/2026/01/2026-2027-DRS1-Contract-Fillable-PDF.pdf",
      "published_at": null,
      "retrieved_at": "2026-11-25",
      "supports": "FSL/GLD methods, seasonal values and warning that non-compliance charges can exceed delivery-year demand credits.",
      "short_excerpt": "",
      "retrieval_note": "Current primary contract indexed text retrieved in search; direct PDF open returned 403. This is not a claim to have reviewed every clause."
    },
    {
      "id": "IM-PROGRAMME",
      "title": "Emergency Demand Response",
      "publisher": "Indiana Michigan Power / Electric Ideas",
      "url": "https://electricideas.com/at-work/emergency-demand-response/",
      "published_at": null,
      "retrieved_at": "2026-11-25",
      "supports": "Monthly payments even without an event; qualification/metering requirements. Page still shows 2025 application deadline, which is not reused as a 2027 deadline.",
      "short_excerpt": "",
      "retrieval_note": "Primary document read or primary page retrieved; no secondary source relied upon."
    },
    {
      "id": "IM-GOOGLE",
      "title": "I&M and Google propose customised demand-response agreement",
      "publisher": "Indiana Michigan Power",
      "url": "https://www.indianamichiganpower.com/company/news/view?releaseID=10359",
      "published_at": "2025-08-04",
      "retrieved_at": "2026-11-25",
      "supports": "Company announcement describes joint filing on 30 July 2025 and a customer-specific agreement; not proof of generic DRS1 participation or subsequent approval.",
      "short_excerpt": "",
      "retrieval_note": "Primary document read or primary page retrieved; no secondary source relied upon."
    },
    {
      "id": "GOOGLE-PRACTICE",
      "title": "Supporting power grids with demand response at Google data centers",
      "publisher": "Google Cloud",
      "url": "https://cloud.google.com/blog/products/infrastructure/using-demand-response-to-reduce-data-center-power-consumption",
      "published_at": "2023-10-03",
      "retrieved_at": "2026-11-25",
      "supports": "Attributed report of operational practice shifting non-urgent tasks; European reductions December 2022–March 2023. No DN independent metering or margin calculation.",
      "short_excerpt": "",
      "retrieval_note": "Primary document read or primary page retrieved; no secondary source relied upon."
    },
    {
      "id": "GOOGLE-CONTRACTS",
      "title": "Demand-response data-center milestone",
      "publisher": "Google",
      "url": "https://blog.google/innovation-and-ai/infrastructure-and-cloud/global-network/demand-response-data-center-milestone/",
      "published_at": "2026-03-19",
      "retrieved_at": "2026-11-25",
      "supports": "Company reports 1 GW integrated into long-term US energy contracts. Contracted, not verified simultaneously delivered or settled.",
      "short_excerpt": "",
      "retrieval_note": "Primary document read or primary page retrieved; no secondary source relied upon."
    },
    {
      "id": "IM-CURRENT-TARIFF",
      "title": "Indiana tariff book, 28 October 2026 version",
      "publisher": "Indiana Michigan Power",
      "url": "https://www.indianamichiganpower.com/lib/docs/ratesandtariffs/Indiana/IM_IN_TB_20_10-28-2026v1.pdf",
      "published_at": "2026-10-28",
      "retrieved_at": "2026-11-25",
      "supports": "Identifies current posted book, but unavailable rider sections are not used to assert site-specific obligations.",
      "short_excerpt": "",
      "retrieval_note": "Initial PDF opened, but relevant rider retrieval repeatedly failed. Listed as an unresolved verification item, not a fully read source."
    }
  ],
  "documented_claims": [
    {
      "id": "164-C1",
      "claim": "IURC approved $9.56 per kW-month through 31 May 2027.",
      "source_ids": [
        "IURC-50926"
      ],
      "basis": "approved_rate",
      "period_end": "2027-05-31",
      "boundary": "Not an all-2027 rate; customer participation and credited capacity are not established."
    },
    {
      "id": "164-C2",
      "claim": "PJM revision 63 gives a 30-minute default response period with 60/120-minute approved exceptions.",
      "source_ids": [
        "PJM-M18-63"
      ],
      "basis": "operator_rule",
      "location": "Section 4.3.1, PDF page 69",
      "boundary": "Does not prove a specific customer's exception, tariff or dispatch instructions."
    },
    {
      "id": "164-C3",
      "claim": "For 2026/27 Capacity Performance: June–October and following May 10am–10pm; November–April 6am–9pm, Eastern Prevailing Time. From 2027/28 all hours. Approved maintenance exception during October–April applies in both periods; interruptions unlimited.",
      "source_ids": [
        "PJM-M18-63"
      ],
      "basis": "operator_rule_with_future_delivery_year_transition",
      "boundary": "Calculator event hours are synthetic; not a cap or a forecast."
    },
    {
      "id": "164-C4",
      "claim": "The customer contract differentiates FSL/GLD and warns that non-compliance charges can exceed delivery-year demand credits.",
      "source_ids": [
        "IM-DRS1-2627"
      ],
      "basis": "primary_contract_indexed_text",
      "boundary": "Full current tariff rider sections not completely retrievable."
    },
    {
      "id": "164-C5",
      "claim": "Google's 2023 publication reports operational reductions; the March 2026 publication reports contracted capacity.",
      "source_ids": [
        "GOOGLE-PRACTICE",
        "GOOGLE-CONTRACTS"
      ],
      "basis": "attributed_company_reports",
      "boundary": "No inference that one measured event delivered 1 GW or used this standard Indiana product."
    },
    {
      "id": "164-C6",
      "claim": "I&M describes a separate customised Google contract filing.",
      "source_ids": [
        "IM-GOOGLE"
      ],
      "basis": "company_announced_filing",
      "boundary": "Announcement does not establish subsequent regulatory approval."
    }
  ],
  "synthetic_cases": [
    {
      "id": "164-S1",
      "label": "Qualified capacity cash budget, December 2026–May 2027",
      "actual_input_ids": [
        "IURC-50926"
      ],
      "inputs": {
        "committed_kw": 1000,
        "monthly_credit": 9.56,
        "credit_months": 6,
        "event_hours": 20,
        "interruption_cost_per_mwh": 500,
        "recovery_cost": 5000,
        "readiness_cost": 10000,
        "settlement_deductions": 0
      },
      "outputs": {
        "gross_credit": 57360,
        "curtailed_mwh": 20,
        "interruption_cost": 10000,
        "total_cost": 25000,
        "net_margin": 32360,
        "settlement_deductions": 0,
        "total_outflows": 25000
      },
      "boundary": "Only monthly credit has a documented rate basis; all capacity, hours and costs are invented. Assumes accepted credited capacity already in place."
    },
    {
      "id": "164-S2",
      "label": "80-hour sensitivity",
      "change": {
        "event_hours": 80
      },
      "outputs": {
        "curtailed_mwh": 80,
        "interruption_cost": 40000,
        "total_cost": 55000,
        "net_margin": 2360,
        "settlement_deductions": 0,
        "total_outflows": 55000
      }
    },
    {
      "id": "164-S3",
      "label": "Higher unit interruption cost",
      "change": {
        "interruption_cost_per_mwh": 2500
      },
      "outputs": {
        "interruption_cost": 50000,
        "total_cost": 65000,
        "net_margin": -7640,
        "settlement_deductions": 0,
        "total_outflows": 65000
      }
    },
    {
      "id": "164-S4",
      "label": "Explicit settlement deduction",
      "change": {
        "settlement_deductions": 40000
      },
      "outputs": {
        "total_cost": 25000,
        "net_margin": -7640,
        "settlement_deductions": 40000,
        "total_outflows": 65000
      }
    }
  ],
  "model": {
    "type": "deterministic cash budget",
    "formulas": {
      "gross_credit": "committed_kw * monthly_credit * credit_months",
      "curtailed_mwh": "committed_kw / 1000 * event_hours",
      "interruption_cost": "curtailed_mwh * interruption_cost_per_mwh",
      "total_cost": "interruption_cost + recovery_cost + readiness_cost",
      "net_margin": "gross_credit - total_outflows",
      "total_outflows": "total_cost + settlement_deductions"
    },
    "exclusions": [
      "Eligibility, registration and accepted capacity",
      "Baseline, loss-factor and seasonal settlement calculation",
      "PJM non-performance formula",
      "Event forecast or cap",
      "Actual AI interruption benchmark",
      "Automatic energy-cost or emissions savings",
      "Aggregator shares, tax and financing unless incorporated consistently into entered costs"
    ],
    "rounding": "Gross credit and interruption charge are rounded independently to integer cents. Money inputs use at most two decimal places. Derived operating costs and settlement deductions then add in cents.",
    "zero_capacity_boundary": "Zero committed kW is allowed only as a counterfactual sensitivity, not as an enrolled or qualified capacity claim. Credit and curtailed MWh become zero; entered fixed costs and deductions remain."
  },
  "unresolved_items": [
    "Latest I&M rider sections and site-specific contract/registration must be obtained before action.",
    "Current enrolment deadline not established by stale 2025 landing-page text.",
    "No specific customer's paid settlement or independent operational results retrieved."
  ],
  "content_sha256": "9987c06e3814ccbfd2ef59c3e6b82f9bfcb912bbd1df40dda0b787240116e775",
  "evidence_records": [
    {
      "id": "164-C1",
      "claim": "IURC approved $9.56 per kW-month through 31 May 2027.",
      "source_ids": [
        "IURC-50926"
      ],
      "basis": "approved_rate",
      "period_end": "2027-05-31",
      "boundary": "Not an all-2027 rate; customer participation and credited capacity are not established.",
      "evidence_type": "attributed_primary_source_observation"
    },
    {
      "id": "164-C2",
      "claim": "PJM revision 63 gives a 30-minute default response period with 60/120-minute approved exceptions.",
      "source_ids": [
        "PJM-M18-63"
      ],
      "basis": "operator_rule",
      "location": "Section 4.3.1, PDF page 69",
      "boundary": "Does not prove a specific customer's exception, tariff or dispatch instructions.",
      "evidence_type": "attributed_primary_source_observation"
    },
    {
      "id": "164-C3",
      "claim": "For 2026/27 Capacity Performance: June–October and following May 10am–10pm; November–April 6am–9pm, Eastern Prevailing Time. From 2027/28 all hours. Approved maintenance exception during October–April applies in both periods; interruptions unlimited.",
      "source_ids": [
        "PJM-M18-63"
      ],
      "basis": "operator_rule_with_future_delivery_year_transition",
      "boundary": "Calculator event hours are synthetic; not a cap or a forecast.",
      "evidence_type": "attributed_primary_source_observation"
    },
    {
      "id": "164-C4",
      "claim": "The customer contract differentiates FSL/GLD and warns that non-compliance charges can exceed delivery-year demand credits.",
      "source_ids": [
        "IM-DRS1-2627"
      ],
      "basis": "primary_contract_indexed_text",
      "boundary": "Full current tariff rider sections not completely retrievable.",
      "evidence_type": "attributed_primary_source_observation"
    },
    {
      "id": "164-C5",
      "claim": "Google's 2023 publication reports operational reductions; the March 2026 publication reports contracted capacity.",
      "source_ids": [
        "GOOGLE-PRACTICE",
        "GOOGLE-CONTRACTS"
      ],
      "basis": "attributed_company_reports",
      "boundary": "No inference that one measured event delivered 1 GW or used this standard Indiana product.",
      "evidence_type": "attributed_primary_source_observation"
    },
    {
      "id": "164-C6",
      "claim": "I&M describes a separate customised Google contract filing.",
      "source_ids": [
        "IM-GOOGLE"
      ],
      "basis": "company_announced_filing",
      "boundary": "Announcement does not establish subsequent regulatory approval.",
      "evidence_type": "attributed_primary_source_observation"
    },
    {
      "id": "164-S1",
      "label": "Qualified capacity cash budget, December 2026–May 2027",
      "actual_input_ids": [
        "IURC-50926"
      ],
      "inputs": {
        "committed_kw": 1000,
        "monthly_credit": 9.56,
        "credit_months": 6,
        "event_hours": 20,
        "interruption_cost_per_mwh": 500,
        "recovery_cost": 5000,
        "readiness_cost": 10000,
        "settlement_deductions": 0
      },
      "outputs": {
        "gross_credit": 57360,
        "curtailed_mwh": 20,
        "interruption_cost": 10000,
        "total_cost": 25000,
        "net_margin": 32360,
        "settlement_deductions": 0,
        "total_outflows": 25000
      },
      "boundary": "Only monthly credit has a documented rate basis; all capacity, hours and costs are invented. Assumes accepted credited capacity already in place.",
      "evidence_type": "synthetic_arithmetic_fixture_with_documented_rate_input"
    },
    {
      "id": "164-S2",
      "label": "80-hour sensitivity",
      "change": {
        "event_hours": 80
      },
      "outputs": {
        "curtailed_mwh": 80,
        "interruption_cost": 40000,
        "total_cost": 55000,
        "net_margin": 2360,
        "settlement_deductions": 0,
        "total_outflows": 55000
      },
      "evidence_type": "synthetic_arithmetic_fixture_with_documented_rate_input"
    },
    {
      "id": "164-S3",
      "label": "Higher unit interruption cost",
      "change": {
        "interruption_cost_per_mwh": 2500
      },
      "outputs": {
        "interruption_cost": 50000,
        "total_cost": 65000,
        "net_margin": -7640,
        "settlement_deductions": 0,
        "total_outflows": 65000
      },
      "evidence_type": "synthetic_arithmetic_fixture_with_documented_rate_input"
    },
    {
      "id": "164-S4",
      "label": "Explicit settlement deduction",
      "change": {
        "settlement_deductions": 40000
      },
      "outputs": {
        "total_cost": 25000,
        "net_margin": -7640,
        "settlement_deductions": 40000,
        "total_outflows": 65000
      },
      "evidence_type": "synthetic_arithmetic_fixture_with_documented_rate_input"
    }
  ],